IJM hill clearing & Trehaus construction damaged nearby houses since 2014 must be mitigated quickly!


Behind BJ Cove houses at Lintang Bukit Jambul 1 is an IJM Trehaus Project.
Approximate Coordinates : 5°20’38.47″N,100°16’52.82″E
Reported  in August 2016. Photos taken in November 2016 and 2014 by Penang Forum
PHW Report

Click to see Video/images: https://hillclearinginpenang.ushahidi.io/views/map

https://hillclearinginpenang.ushahidi.io/views/map

Sources: Penang Hills Watch (PHW) | Penang Forum

Hill clearing activity by IJM Trehaus Project


Clearing and construction for a condo and semi-detached housing project, Trehaus, reported in http://anilnetto.com/ 26 Aug 2016. Photo taken in 2014 …

Behind BJ Cove houses at Lintang Bukit Jambul 1 is an IJM Trehaus Project.

IJM Hill Clearing 2014

Two invalid pipe culverts formed sinkholes at BJ Cove houses

The following plan clearly shows an underground pipe culvert from the IJM Trehaus site that converged  directly, vertically at BJ Cove houses from another underground  pipe culvert at nearby pond were burst, caused house cracks, floods, formed sinkholes (by two pipe culverts converged in red) and damaged  to  BJ Cove houses in 2015 due to blockages of waters whenever rains and because of lack of drainage systems.  The sinkhole was caused by soil erosion due to waters under the ground.Therefore, damages to houses were caused by severe soil erosion due to water movement under the road and buildings.

Underground Pipe Culverts from IJM Trehaus site on the left and nearby pond on the right

The following is an underground pipe culvert from the IJM Trehaus site behind BJ Cove houses at Lintang Bukit Jambul 1:

IJM constructing an underground pipe Culvert in 2014 to BJ Cove Houses

IJM constructing an underground pipe Culvert in to BJ Cove Houses

IJM Underground Pipe Culvert to BJ Cove Houses

IJM Underground Pipe Culvert to BJ Cove Houses
Waters gushing down from IJM Trehaus site to BJ Cove houses:
Waters flow from IJM Trehaus to BJ Cove houses

 

Waters gushing down from IJM Trehaus site to BJ Cove houses

Waters from IJM site stucked at behind BJ Cove houses

The nearby pond besides IJM Trehaus site:

Serious Drainage Issues

The Department of Irrigation and Drainage (DID or JPS) has just started
constructing the drain from the pond to divert the waters:
A drain under construction by JPS to divert waters from the nearby pond but show no sign to divert waters from IJM Site
Drain water flow under construction by JPS to divert waters from the nearby pond
We are concerned as to how IJM is going to resolve the pipe culvert from their side as JPS has confirmed IJM failure to comply with sediment control plan (ESCP).

Letters fromThe Department of Irrigation and Drainage (DID or JPS)

Clearly, the underground pipe culverts leaked and waters seeped through the
cracks as it did not happen immediately but over a period of time!

Despite the underground pipe culverts declared invalid by JPS and the Penang City Council’s (Majlis Perbandaran Pulau Pinang, i.e. MBPP) has issued stop work orders directing the developers, Worldwide Venture Sdn Bhd, a subsidiary of IJM Land to rectify the damages within 1 and 2 weeks time since 2015 (as per the attached letters below), multiple wall cracks, slabs collapsed, PBA water pipes burst, leakage charges, damaging ceiling, electrical DB board, and tiles fallen, broken/popped up,  are still pending settlement and remedial works to be carried out by parties responsible for the damages since 2014 !!

Letters from Penang City Council’s (Majlis Perbandaran Pulau Pinang)

Letters from Developers: Worldwide Venture Sdn Bhd, an subsidiary of IJM Land:
 

 

 Damaged houses

 Damages appeared after IJM began construction works in 2014, like hill clearing, rock-blasting, piling and digging culvert at Trehaus site. As a result, waters seepage through multiple cracks on the ground, walls, tiles fallen from roofs and popped up from the ground due to vibration from rock-blasting and piling for the building.

 Pictures showing floods, sinkholes at Lintang Bukit Jambul 1, 11900 Penang,  damaged to BJ Cove houses, cracks, waters leakages seeped through the cracks, slabs collapsed, ceilings & tiles broken & fallen, electrical DB board explosion, etc caused by severe soil erosion due to water movement under the road and buildings. The underground pipe leaked and waters seeped through the cracks!

Sinkhole at BJ Cove house no. 20
IJM converted the sinkhole into a manhole waters from their underground pipe culvert at Trehaus
Sinkhole at house 20 is covered up by IJM’s underground pipe culvert from  IJM Trehaus
IJM converting the sinkhole at BJ Cove no. 20

We demand immediate enforcement & Actions, Truth be told:

 

1. The parties responsible must quickly without further delays, to settle the claims and start the remedial works to the damaged houses without condition, as both JPS has declared underground pipe culverts invalid and BPP has  issued stop work orders directed the developers, Worldwide Venture Sdn Bhd, a subsidiary of IJM Land to rectify the damages  ithin 1 and 2 weeks time since 2015!

2. Enforce IJM’s & MBPP’ Letters/Stop-work Orders (above attacked), and divert waters from the two invalid underground pipe  culverts deemed illegal at the IJM Trehaus site and nearby ponds which must be closed and grouted as a long term solution to the problems.

3. Beef up the enforcement and accountability not just in government agencies but also in professional bodies, like the Board Of Engineers Malaysia (BEM),  the Institute of Engineers Malaysia (IEM), etc to  uphold the professional ethics, integrity and standards, to ensure public safety of the buildings and people life.

Findings from Penang Forum 

Dr Kam, a scientist, focused on expansion of impermeable surface area (caused by ill­ planned development and replacing natural ground cover such as hills, fields and trees that act as a water ­absorbing sponge) and soil erosion and landslides (caused by cutting and development in hill areas) as two factors that need special attention.

She quoted Datuk Kam U Tee, the Penang Water Authority general manager (1973~­90), as having correctly explained the Penang floods of October 2008, as follows: the floods were caused by conversion of the Paya Terubong and Bayan Baru valleys into “concrete aprons that do not retain water. The water immediately flows into streams causing flash floods even with moderate rainfall. Because of hill­cutting activities, the flowing water causes erosion of the slopes which carries mud and silt into the river beds”. ( The Star, Oct 24, 2008).

See more.. Penang floods and landslides, looking beyound natural causes!

Credits – Slides presented by Environmental, health and safety consultant Aziz Noor, and scientist Dr Kam Suan Pheng at the Penang Forum event on Oct 29, 2017

Practise true CAT for Sustainable Development

  • Penang government must provide a COMPETENT flood mitigation plan for the state starting with a comprehensive Drainage Master Plan Study and not slogan.

  • The Penang government has to be ACCOUNTABLE to the people and not private developers. In other words, ‘Politicians should be ‘wakil rakyat’ and not ‘wakil pemaju’. If certain waterways and catchment areas have to be gazetted as permanent drainage and storage areas, then so be it.

  • The safety and well-being of the Rakyat has to come first.  In the interest of  TRANSPARENCY, Penang has to launch an inquiry into how the local council approved property developments on slopes without adequate slope protection.

 See more …

Related Links:

Turning a blind eye: The grumblings over exposed hills are growing louder but little is being done to rectify the situation   G…
Choong (in white) surveying the deforested hillslope next to Majestic Heights. PENANG MCA has raised concerns about the safety of the r…

Becoming bald: A view of the clearing work seen at Bukit Relau which was visible from the Penang Bridge in November last year. GEORGE..

Wet, wet woes: (Above) Bukit Jambul is flooded once again after an evening downpour. Firemen installing a pump to draw floodwater…
Council should not bow to development or political pressure, says city councilor, Khoo ‘Politicians should be ‘wakil rakyat’ and n…
Seeking solutions: Penang Forum member and soil expert Dr Kam Suan Pheng giving her views during the dialogue session themed ‘Penang Fl…

(From left) Dr Kam will deliver a talk on ‘Understanding the Causes of Floods and Seeking Solutions. State assemblymen expressing inter…
https://youtu.be/4qaOB1n5tgA GEORGE TOWN: The Penang Island City  Council has lodged a police report against the consultant of the aff…

Speaking out: Penang Forum members protesting outside the CAP office in George Town. Don’t just make it about worker safety issues ..

https://youtu.be/QB45Q2_mOG0 Suspicious activity: A photo taken from Penang social activist Anil Netto’s blog showing an active s..


Some representatives of the 24 residents associations and management corporations showing messages urging the state to resolve the flood…

Getting titles right in the engineering field in Malaysia

Getting titles right in the engineering field in Malaysia ..

RECENTLY, the Institution of Engineers Malaysia (IEM) received an   enquiry on the usage of the title “Engr.” for members of the institution. The title “Ir” was first introduced by IEM in the early 1970s for both the graduate and corporate members of the Inst…Getting titles right in the engineering field in Malaysia rightwaystosuccess.blogspot.com

  2 structures collapse due to incompetent engineers and irresponsible officer of MPPP/MBPP

 Penang has acknowledged the Hills Clearing cases reported by Penang Forum

 

Penang Forum tells Chief Minister: the unmitigated disasters on hill projects 
Wall and awning collapsed in house near construction site
Penang Island City Council, MBPP councilor Dr Lim fed up change not happening in Penang

Penang Forum concerns over hill clearing and floods; the Declaration & Recommendation 

 Penang flood aftermath: design pump system needed to drain out water, fix funding snag …

  Long and winding road: This satellite picture from Google Earth Pro shows five planned interchanges of the Teluk Bahang-Tanjung Bun…

Humans Are Destroying the Environment   PETALING JAYA: They are supposed to be guardians of the environment, and yet “certain enforcem…

LATELY, we have been seeing many photographs and a lot of video footage of handcuffed men and women in orange T-shirts bearing the wor…

IJM and Genting excluded from investments wealth fund due to severe environmental damage

Environmental issues: IJM and Genting have interests in palm oil operations. Norwegian fund to call off investments on environmental iss…

PETALING JAYA: Some RM40mil from the Skills Development Fund Corp is believed to have been siphoned off by those tasked with utilising it.

Getting titles right in the engineering field in Malaysia

 